Lightning Risk Analysis Program
Protection Level Selection - NFC 17-102 Standard
Risk Assessment According to IEC 62305 / TS EN 62305 Standard
Building Dimensions
meters
meters
meters
Environmental Coefficient (C1)
Structural Coefficient (C2)
Select the value from the table below based on roof and building material:
| Roof / Structure | Metal | Tile | Flammable |
|---|---|---|---|
| Metal | 0.5 | 1.0 | 2.0 |
| Tile | 1.0 | 1.0 | 2.5 |
| Flammable | 2.0 | 2.5 | 3.0 |
Selected C2 Value: -
Building Content Coefficient (C3)
Human Density Coefficient (C4)
Building Importance in the Area (C5)
Thunderstorm Days (Nk)
Select according to your region from the Turkey Thunderstorm Map below.
Calculation Results
Effective Equivalent Area (Ae)
-
m²
Lightning Density (Ng)
-
strikes/km²/year
Expected Lightning (Nd)
-
strikes/year
Total Coefficient (C)
-
C2×C3×C4×C5
Approved Lightning (Nc)
-
strikes/year
Efficiency (E)
-
1-(Nc/Nd)
-
-
-
Mesh Size
-
Down Conductor Spacing
-
Rolling Sphere Radius
-
Protection Level Reference Table
| Efficiency (E) | Protection Level | Mesh Size | Down Spacing | Rolling Sphere Radius = r |
|---|---|---|---|---|
| E > 0.98 | Level I + Additional Measures | 5×5 m² | 10 | 20 m |
| 0.95 < E ≤ 0.98 | Seviye I (LPL1) | 5x5 m² | 10 | 20 m |
| 0.90 < E ≤ 0.95 | Seviye II (LPL2) | 10x10 m² | 10 | 30 m |
| 0.80 < E ≤ 0.90 | Seviye III (LPL3) | 15x15 m² | 15 | 45 m |
| E ≤ 0.80 veya Nd ≤ Nc | Seviye IV (LPL4) | 20×20 m² | 20 | 60 m |
Note: IF Nd ≤ Nc, PROTECTION IS OPTIONAL.
IF Nd > Nc, PROTECTION IS REQUIRED. In this case; Efficiency, E=1-(Nc/Nd) calculated value determines the PROTECTION LEVEL.
Active Lightning Rod Selection Tables
Active lightning rods provide a wider protection area compared to standard rod lightning conductors. The tables below show the protection radius (Rp) in meters based on building height and protection level.
Piezoelectric Crystal Active Lightning Rod Selection Table
| H(m) | ΔT=15μs | ΔT=30μs | ΔT=45μs | ΔT=60μs | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| I | II | III | IV | I | II | III | IV | I | II | III | IV | I | II | III | IV | |
| 2 | 13 | 15 | 18 | 20 | 19 | 22 | 25 | 28 | 25 | 28 | 32 | 36 | 31 | 35 | 39 | 43 |
| 4 | 25 | 30 | 36 | 41 | 38 | 44 | 51 | 57 | 51 | 57 | 64 | 72 | 63 | 69 | 78 | 85 |
| 5 | 32 | 37 | 45 | 51 | 48 | 55 | 63 | 71 | 63 | 71 | 81 | 89 | 79 | 86 | 97 | 107 |
| 6 | 32 | 38 | 46 | 52 | 48 | 55 | 64 | 72 | 63 | 71 | 81 | 90 | 79 | 87 | 97 | 107 |
| 8 | 33 | 39 | 47 | 54 | 49 | 56 | 65 | 73 | 64 | 72 | 82 | 91 | 79 | 87 | 98 | 108 |
| 10 | 34 | 40 | 49 | 56 | 49 | 57 | 66 | 75 | 64 | 72 | 83 | 92 | 79 | 88 | 99 | 109 |
| 20 | 35 | 44 | 55 | 63 | 50 | 59 | 71 | 81 | 65 | 74 | 86 | 97 | 80 | 89 | 102 | 113 |
| 30 | 35 | 45 | 58 | 69 | 50 | 60 | 73 | 85 | 65 | 75 | 89 | 101 | 80 | 90 | 104 | 116 |
| 60 | 35 | 45 | 60 | 75 | 50 | 60 | 75 | 90 | 65 | 75 | 90 | 105 | 80 | 90 | 105 | 120 |
Electrostatic Active Lightning Rod Selection Table
| H(m) | ΔT=30μs | ΔT=45μs | ΔT=60μs | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| I | II | III | IV | I | II | III | IV | I | II | III | IV | |
| 2 | 19 | 22 | 25 | 28 | 25 | 28 | 32 | 36 | 31 | 35 | 39 | 43 |
| 4 | 38 | 44 | 51 | 57 | 51 | 57 | 64 | 72 | 63 | 69 | 78 | 85 |
| 5 | 48 | 55 | 63 | 71 | 63 | 71 | 81 | 89 | 79 | 86 | 97 | 107 |
| 6 | 48 | 55 | 64 | 72 | 63 | 71 | 81 | 90 | 79 | 87 | 97 | 107 |
| 8 | 49 | 56 | 65 | 73 | 64 | 72 | 82 | 91 | 79 | 87 | 98 | 108 |
| 10 | 49 | 57 | 66 | 75 | 64 | 72 | 83 | 92 | 79 | 88 | 99 | 109 |
| 20 | 50 | 59 | 71 | 81 | 65 | 74 | 85 | 97 | 80 | 89 | 102 | 113 |
| 30 | 50 | 60 | 73 | 85 | 65 | 75 | 89 | 101 | 80 | 90 | 104 | 116 |
| 60 | 50 | 60 | 75 | 90 | 65 | 75 | 90 | 105 | 80 | 90 | 105 | 120 |
Note: Table values show the protection radius (Rp) in meters.
ΔT: Early conductivity time (μs - microsecond)
H: Lightning rod installation height (meters)
